Make this your homepage
Tripura News
Home > Tripura News
Load-shedding problems may disrupt public lives in Durga puja : Tripura reels under massive power cut problems
TIWN Aug 5, 2019
Load-shedding problems may disrupt public lives in Durga puja : Tripura reels under massive power cut problems
PHOTO : File Photo

AGARTALA, Aug 5 (TIWN): Bank and hospital services have been majorly affected due to continuous load-shedding which has become a big challenge for the Govt, raising question, how the month of Durga puja will undergo. Power Dept of Tripura, which is facing public rage due to massive load-shedding problems in the state, The Asian Development Bank (ADB) has sanctioned a Rs 1,925 crore project for upgradation of power generation. Deputy Chief Minister Jishnu Dev Barman has announced this to media. The amount was recently sanctioned to the Tripura State Electricity Corporation Limited (TSECL) after the state government had sought the ADB's assistance. Govt of Tripura headed by Chief Minister Biplab Deb managed two sets of loans from ADB as the state’s power connectivity needs a full renovation.One is for the power dept whereas another is Rs. 1650 Crores were approved for infrastructure development

This will include such as piped water supply, underground drainage, underground sewage or scientific septage management, roads with pavement etc in seven district Headquarter towns other than Agartala i.e. Khowai, Ambassa, Dharmnagar, Kailashahar, Udaipur, Bishramganj, Belonia. Asian Development Bank will provide Rs. 1650 Cr( $235 million) out of which 80% is grant in aid and the State will have to repay back only 20% loan in due course of time.   However, now Power dept has to take this opportunity to prove the Govt can truly transform the state into a model state brining a revolution in power management.

Jishnu Dev Barman while detailing the utilization of the funds said, “The project has been sanctioned for upgrading capacity of 63 MW Rokhia Project to 120 MW at an estimated cost of Rs 699.80 crore and modernising Gumti Hydro Electric Project at an estimated cost of Rs 1225.88 crore”.

Rs 12.7 crore for overhaul of the 49.15 km-long Ambassa-Gandacherra power transmission line has also been sanctioned.

TIWN published footage on yesterday, how Govt hospitals are suffering due to power cut problems in Tripura along with other offices including banking service.

Dept’s Minister Jishnu Dev Barman recently in a media interview has slammed the previous CPI-M Govt for that saying, it’s responsible for poor infrastructure of the dept bound the present BJP Govt to receive loan of 1200 crores from Asian Development Bank (ADB).

 The Asian Development Bank is a regional development bank established on 19 December 1966, which is headquartered in the Ortigas Center located in the city of Mandaluyong, Metro Manila, Philippines. The company also maintains 31 field offices around the world to promote social and economic development in Asia.

Add your Comment
Comments (0)

Special Articles

Sanjay Majumder Sanjay Majumder
Anirban Mitra Anirban Mitra