Tripura News
Home > Tripura News
Poor construction work on Howrah river bank protection project : Locals Protested
TIWN June 3, 2018
TIWN June 3, 2018
PHOTO : Poor construction work at Dasmighat on Howrah river safety project. TIWN Pic June 3
AGARTALA, June 3 (TIWN): Locals have come in massive protest after spotting poor construction work in Howrah river protection work.
Since few days construction works had started on Howrah river bank aiming to stop the flood chances on the river banks and few artificial boulders are being constructed for that.
But locals have alleged that the works are going on with very raw materials without proper observation and monitoring.
If the works continue like this, the boulders will be spoiled soon after putting on river sides.
Locals today have called media, alleging about the ongoing poor construction works on river banks. They have drawn the attention of state govt in that issue.
Add your Comment
Comments (0)
More Tripura News
- Storm, Hailstorm dismantled home : Family forced to survive under Open-Sky with Children : Seek Govt assistance
- Human Trafficking : 2 more arrested by GRP Police
- ‘The Real Culprits will never be Arrested ; Only some people made Scapegoats’: Sudip Barman’s blasted on BJP Govt over Vicky murder case investigation
- Huge Quantities of Expired Chips, Cold Drinks Seized from Tripura University lined Shops
- 23 years girl arrested in Bharat Ratna Club Secretary Vicky murder case